• CONTACT US
  • 搜索
    CN
    Copyright 2017 © Zhejiang Sanwei Rubber Item Co., Ltd.  Powered by 300.cn 浙ICP备13006937号
    After Sales
    CONTACT
    Tel :  +86-576-8351 8393 +86-576-8351 8366  E-mail :  01@three-v.com
    SERVICE    
    SANWEI RUBBER has over 25 years experience providing Conveyor Maintenance to a wide range of mining clients supplying labor equipment and materials. We offer:
    Belt Installation and splicing services
    → Emergency breakdown callout service
    → Scheduled maintenance
    → Remote location service contacts
    → Project installation
    → Specialized change outs systems and produces for reduced down time
    → Splicing innovation (having developed new spicing methods for greater life)
    → Fully trained and nationally accredited Service staff
    → Splicing Services cover all aspects of conveyor belting, include Multi-ply conveyor belt, Steel Cord, Solid Woven underground belts,etc.
     
    Projects
    Our Engineered Conveyor Solutions is able to offer a systematic approach to undertake all types of turnkey installations commissioning for surface
    and underground mine sites, ship loading, stockpiling & ore processing.
     
    Technical Services
    Always offering a range of services to assist with initial design and predictive maintenance such as:
    → Conveyor Design
    → Conveyor Belt mapping service
    → Independent splicing QA
    → Belt pull calculations to help ensure the safe and controlled installation of Conveyor Belting
    → Conveyor Belt inspections with automatic reporting including a summary showing areas needing urgent attention
    → Financial reporting on Whole Of Life cost and $/ton highlighting details of areas of high spend
    → Non-destructive testing incorporating predictive Conveyor Belt life details to aid planning of Conveyor Belt change outs and maintenance
    budgeting   V Belt runs longer and perform better if they are given the proper care and attention during installation. Proper care as below:
    → Check pulleys and make them aligned. Incorrect alignment may shorten the service belt life.
    → Check the pulley main components and lubricate the working parts periodically.
    → Pay attention to the pulley grooves and make sure they are all equal in dimensions.
    → Check the pulley abrasion and remove any rust, dirt or grease that may influence belt usage.
    → Ensure heat dissemination of pulley in belt operation.
      V belt installation as follows:
    → Locate belt by moving the motor
    → Put belts onto the pulley one by one and locate belts first on the driving pulley
    → Do not use a lever to force belt onto pulleys but turning pulley slowly can facilitate installation.
    → Apply tension to prevent slippage at full loading and run 5 minutes and re-tension. If necessary, please re-adjust the tension after belts running a few days.
    → Do not combine to use new and used belts in one set that may shorten belt life due to unbalanced stretch of belts.
     
     
    >
    Service